With Plant F-4, the Pergande Group has established a production facility at its Weißandt-Gölzau site for the manufacture and filling of liquid crop protection formulations. The project combines the integration of process engineering into an existing building with a new structure for filling and packaging.

Scope of Work and Process

The goal was the batch-wise production of various liquid formulations followed by automated filling. The product range includes suspension concentrates, emulsifiable concentrates, and soluble concentrates.

Separate plant sections enable the processing of organic and aqueous phases for complex formulations. Raw material and product tanks are used for storage and buffering between production and filling.

Up to 40,000 liters of daily capacity. Completed in about 15 months.

With F-4, the Pergande Group has built a production facility at its Weißandt-Gölzau site for the manufacture and filling of liquid crop protection formulations. The project combines the integration of process engineering into an existing building with a new structure for filling and packaging.

Scope of Work and Process

The goal was the batch production of various liquid formulations followed by automated filling. The product range includes suspension concentrates, emulsifiable concentrates, and soluble concentrates.

Separate plant sections enable the processing of organic and aqueous phases for complex formulations. Raw material and product tanks are used for storage and buffering between production and filling.

Automated Filling and Packaging

The filling line processes containers ranging from 0.5 to 10 liters. Filling, packaging, and labeling are fully automated, including serialization.

Integrated Project Implementation

The planning encompassed process engineering, the raw material tank farm, and the filling and packaging areas. The retrofit of existing facilities and the new construction were coordinated with regard to product flow paths, media supply, and operational interfaces. The new filling building was completed within six months.

Project Data

FeatureDescription
LocationWeißandt-Gölzau, Saxony-Anhalt
Investmentapprox. 20 million €
Total project durationApprox. 15 months
CapacityUp to 40,000 L/d in 24/7 operation
ProcessBatch-based liquid formulation with separate processing of organic and aqueous phases
Raw Material Storage3 × 40,000 L
Product storage3 × 40,000 L
Filling capacityUp to 48,000 L per shift
Container sizes0.5–10 L
Packaging and LabelingFully automatic, including serialization
Overall planningEngineering by the Pergande Group
Project ImplementationEngineering, procurement, and installation through commissioning by the Pergande Group
0
liter
per day
0
million euros
Investment Volume
0
Months
Implementation Period

Request for References

More Projects. Tailored to Your Needs.

The references shown here are a selection from more than 3,000 completed projects. Contact us—we’d be happy to show you additional examples that match your product, process, or application area.

Inquiries